Quality and continuous improvement

Product quality and rejects: from the defect to its origin in the process

Illustration: rejected parts on a line and a Pareto chart of their causes.

Every defect, reject, rework or return says something about how that product was made. The problem is that this information is usually spread across the quality system, the production records and customer complaints, and is almost never looked at together. In this article we explain how to connect it, how to measure its real economic impact and how to decide where to start.

Why quality data is not enough on its own

Most plants record defects in quite some detail: type, quantity, date, line and, sometimes, who detected it. With that you can build Pareto charts and know which defect appears most often. What you cannot know is why it appears. To answer that question, each quality incident has to be linkable to the batch it comes from and to the conditions in which it was made: raw material used, temperatures, times, speeds, shift and equipment.

That link is traceability, and in many plants it exists on paper but not in the data. Returns arrive weeks later and are associated with an order, not a batch. Rework is noted in a shift report. Internal rejects are recorded in a different sheet from the process variables. Before any analysis, the first job is to rebuild that thread.

  • Common identifier: the batch number, or a combination of date, line and production order, that allows all the sources to be joined.
  • Correct time window: in continuous processes you have to take the residence time into account; what is measured at the outlet depends on what happened hours earlier in the previous stages.
  • Same definition of defect: if each shift classifies differently, the analysis compares criteria, not processes.

How to measure the economic impact without double counting

To prioritise you need to put figures on things, and this is where it is easy to get it wrong. The same batch can generate internal rework, a rejected portion and, later, a return. If each department adds up its cost separately, the total exaggerates the impact and also distorts the comparison between challenges.

The most robust way to avoid this is to follow the path of each batch and assign it a single final destination: sold without incident, reworked and sold, sold as second quality, scrapped or returned. Each destination is associated with its incremental cost compared with a good batch. For example, if a batch is reworked and then sold normally, its cost is the cost of the rework (energy, labour, capacity used), not the full value of the product.

  • Direct cost: lost raw material, energy and rework hours, waste management.
  • Capacity cost: line time spent on rework is time not spent on production; when the plant is at full capacity, this cost can be the largest.
  • Commercial cost: returns, discounts and reverse logistics. It is best estimated cautiously and kept separate, because it is the hardest to attribute.

The result does not have to be accurate to the euro. It has to be consistent, so that two problems can be compared using the same criterion.

Prioritising: which quality challenge to tackle first

Once the impact has been estimated, the temptation is to attack the most expensive defect. It is a good starting point, but not the only criterion. You also need to assess the likelihood of finding an explanation in the available data and your real ability to act on it.

A defect that costs a lot but has hardly any associated process records may require months of data collection before it can be analysed. Another, somewhat less costly, with good traceability and well-measured variables, can deliver results in a few weeks and build the confidence the team needs to tackle the big one afterwards. A simple impact versus feasibility matrix is usually enough to order the portfolio of challenges.

From data to origin: linking defects to manufacturing conditions

When quality incidents are linked to batches and their manufacturing conditions, you can look for what distinguishes batches with defects from good batches. In the plant, process variables are usually closely related to each other: a temperature drags a pressure along with it, a flow rate depends on a set point, the raw material affects several stages at once. Analysing them one by one leads to confusing or contradictory conclusions.

That is why it pays to work with multivariate techniques that consider all the variables at once and that are also explanatory: models that show which factors influence the defect and to what extent, so that the plant team can check them against their experience. A model that gets it right but does not explain why is hard to defend in front of production and even harder to turn into a concrete action. If you want to see how we approach this kind of analysis, we explain it in process improvement.

The result of this phase is not a list of correlations, but a small set of actionable hypotheses: adjusting an operating window, reviewing a raw material acceptance criterion, modifying a cleaning sequence or changing the production order.

Checking that the improvement is real

Once a change has been applied, the question is whether it has worked. Comparing the following month’s reject rate with the previous one is not enough: natural variability, the seasonality of the raw material or a change in the product mix can produce an apparent improvement or hide a real one.

  • Define in advance how you will measure: the indicator, the reference period and the size of the difference you would consider relevant.
  • Compare under equivalent conditions: same products, same line and, if possible, raw material with similar characteristics.
  • Monitor over time: a control chart on the quality indicator shows whether the process has shifted in a stable way or whether it was a one-off effect.
  • Translate the result into euros: using the same cost criterion you used to prioritise, so that the balance is consistent.

A proven improvement is the best argument for dedicating resources to the next challenge on the list.

What to do first

You do not need a big project to get started. We suggest three steps you can take with what you already have:

  • Choose a defect and a period: the defect that worries you most and the last few months of production on a single line.
  • Check traceability: for that period, try to join each incident with its batch and with that batch’s process records. Whatever you cannot join tells you where the first improvement lies, and it is a data improvement.
  • Make a first cost estimate: assign each batch a single final destination and its incremental cost. With that figure you will have an objective basis for deciding whether it is worth going deeper.

This way you will know whether the challenge is well defined, whether the data allows it to be analysed and how much solving it is worth.

How can we help you?

Leave us your phone number or email address. We will get in touch to learn about your challenge and assess together how we can help you, with no commitment.

One of the two is enough. Choose how you would prefer us to contact you.

Would you like to tell us anything else? (optional)

When you submit, your email app will open with the message ready for you to review and send.