ARGOS

Intelligent process monitoring

Many variables.Two charts.

Analyse how the variables in your process relate to each other. Detect deviations that can go unnoticed even when every measurement is within its limits, and see which variables to review.

Watch ARGOS in one minute1:04
ARGOS screenshot: dashboard with the process monitoring charts, the table of out-of-control observations and the contribution of each variable.

The ARGOS difference

Every variable complies. What about the process?

The same process, at the same moment, monitored in two ways.

Usual approach

Traditional control

One chart per variable

  • More charts
  • Later
  • Less insight

What you see on screen

200charts, one per variable

200 variablesAll green
PressureTemperature+161

All green: none of them alerts.

This moment

max.min.min.max. This batch Temperature Pressure

Temperature rises and pressure falls, but each one stays within its limit: no alert.

What happens next

  1. Off-spec product
  2. Leaves the plant with no alert
  3. Possible customer rejection

No alert: the batch goes wrong without anyone knowing and reaches the customer.

With Kensight

With ARGOS

All variables at once

  • Faster
  • More robust
  • Simpler

What you see on screen

2indicators for all 200 variables

ARGOS · 200 variables1 alert
Anomalies Are the variables related as usual? Alert Extremes Moving together as usual, but too far from normal? In control This batch: one point in each chart

Each part, batch or sample is a point in both indicators.

This moment

This batch Temperature Pressure

They have always moved together, and now they do not: alert.

What happens next

  • Temperature ↑ above average
  • Pressure ↓ below average
  • Flow rate
  • pH

Instant alert: the plant manager knows what to check right away. Temperature above its average; pressure below it.

It’s not magic. ARGOS sums up the whole process in two indicators, tells you when and where to look, and you confirm it in your usual charts.

How it works

From data to action

This is how your team works with ARGOS, shown with real screenshots of the dashboard. ARGOS is built on the model of your process that we develop during the project.

Skip the dashboard animation
  1. Monitor your whole process with just two charts

    Each new data point is compared with the reference for good operation of your process. One chart warns you if the process moves away from its usual values (extreme values); the other, if the variables stop relating to each other as they always have (anomalous values), even if each one is still within its limits.

    ARGOS screenshot: the two monitoring charts, anomalous values and extreme values, each with its limit as a dashed line; the points that exceed it are shown in red.
  2. Early detection of deviations

    When the behaviour changes, ARGOS highlights the signal. The shift manager can review what has happened and decide the next step.

    ARGOS screenshot: the last point of the anomalous values chart, observation 561, circled above the limit; below, the table of out-of-control observations with row 561 selected.
  3. Identify which variables contribute to the deviation

    The bars show how much each variable contributes to the deviation. Your team can focus the review on those that have had the most influence on the signal.

    ARGOS screenshot: contributions chart for observation 561; the two longest bars, cooling water flow and temperature, are boxed.
  4. Comparison with the process history

    Compare the relationship between variables with the times when the process was working well. This way you can see changes that an isolated reading does not show.

    ARGOS screenshot: scatter plot of cooling water flow against temperature; the historical points form a diagonal band and the new data point, circled, lies far from it.
ARGOS dashboard: the two monitoring charts, the table of out-of-control observations, the contributions of each variable and the bivariate chart.
ARGOS dashboard with the scatter plot of cooling water flow against temperature open.
Tour of the ARGOS dashboard in four steps; the text for each step is above the monitor.

ARGOS in one minute

Video

ARGOS in one minute

ARGOS presentation video, with music and no voice-over. The production line is a recreation; it does not correspond to any client’s plant.

Video description:

  1. The ARGOS logo appears.
  2. “A production line.” An animated line with three stages: treatment, cooling and quality.
  3. “Process sensors.” The sensors on the line take data from each part.
  4. “Every part leaves a data history.”
  5. “A combined view.” Above the line, a screen with the ARGOS dashboard.
  6. “Every part updates the view of the process.”
  7. “All the variables in two charts.” “Normal operation reference.”
  8. “Deviation detected.” Part 547 exceeds the limit in both charts and is marked in red.
  9. The control dashboard: anomalous and extreme values, out-of-control observations, contributions and bivariate scatter plot.
  10. “Which variables explain the anomaly?” For part 547, the two variables with the largest contribution are sealing temperature and line speed.
  11. “Correlation break confirmed”, based on those two variables: part 547 falls outside the usual relationship between them.
  12. “See your whole process. At once.” Joint analysis of the process, the “Let’s talk” button and kensight.es.

Implementation

Start with a defined process

We review the variables, the data sources and the operating conditions. Then we agree on the monitoring scope.

  • A monitoring objective.
  • Data related to the process.
  • A team to interpret and review the signals.
What does joint analysis add?

Two variables can be within their individual limits and still show a relationship that differs from the usual one. ARGOS also takes those relationships into account.

Why can there be alarms without a quality problem?

Fixed ranges that are too narrow can trigger warnings even though the product is still correct. The opposite can also happen: each measurement meets its range, but the combination has changed. That is why we review how the process behaves when it works well and which relationships are worth monitoring.

How does it help the shift manager?

The contributions show which variables to review first. The manager can guide the operator and check what happened against the real situation in the plant.

What data and integrations are needed?

We review variables, frequency, batches and quality measurements. The connection to the sources and the infrastructure is defined for each implementation.

Can we extend it to other lines?

A first process can be studied and other lines or products assessed afterwards. Each extension requires reviewing its data and its model.

How can we help you?

Leave us your phone number or email address. We will get in touch to learn about your challenge and assess together how we can help you, with no commitment.

One of the two is enough. Choose how you would prefer us to contact you.

Would you like to tell us anything else? (optional)

When you submit, your email app will open with the message ready for you to review and send.