Six Sigma offers an orderly framework for improving processes: define, measure, analyse, improve and control. But when the process has dozens or hundreds of variables that move together, the classical statistical tools that usually accompany DMAIC fall short. In this article we explain why, and how multivariate techniques fit into that cycle.
Six Sigma and industrial statistics: a solid starting point
The Six Sigma methodology has given industry something very valuable: a common language for talking about variability and a sequence of work, DMAIC, that requires you to define the challenge properly, measure before giving an opinion and check the results. Within that framework, well-known statistical tools are used, such as control charts, capability analyses, hypothesis tests, regression and design of experiments.
These tools work very well when there are few relevant variables and they are reasonably independent of one another. This is the typical situation in many discrete manufacturing processes or in planned studies in which the team decides which factors to vary. In the chemical and agri-food industry, however, the reality of the data is usually different.
When there are many correlated variables
A modern process plant records temperatures, pressures, flow rates, levels, stage times, raw material properties and laboratory analyses. It is common to have hundreds of variables per batch or per minute. And those variables are not independent: they are linked by the physics and chemistry of the process, by the control loops and by the operators’ decisions.
In that context, univariate approaches pose several challenges:
- Too many comparisons: if you analyse each variable separately, some will appear relevant by pure chance.
- Confounded effects: if two variables always move together, a classical regression cannot separate their effects, and the coefficients become unstable or even change sign.
- Invisible combinations: a batch can have all its variables within range and still have an anomalous combination that explains a poor result.
- Incomplete data: historical records often have gaps, and many classical techniques do not handle them well.
Multivariate techniques within DMAIC
Multivariate techniques based on latent variables are designed precisely for this situation. Instead of treating each variable separately, they summarise the information from many correlated variables into a few directions that capture how the process really varies.
Principal component analysis (PCA) shows at a glance how the process has behaved over time: which batches are similar to one another, which depart from the usual pattern and which variables explain those differences. It is very useful in the measure and analyse phases, to understand the data before looking for relationships with quality.
Partial least squares (PLS) regression goes a step further: it relates the set of process variables to one or more responses, such as yield, purity or a defect, even when the variables are highly correlated and there are more variables than observations. In the analyse phase it helps to identify which groups of variables are associated with the result and to what extent.
These techniques do not replace DMAIC; they strengthen it. Nor do they replace design of experiments: analysing historical data often helps to choose which factors are worth studying afterwards with a planned experiment.
Explanatory models versus black boxes
Today it is easy to train models with great predictive power that, however, do not explain how they arrive at their result. In some contexts that is acceptable. In process improvement, it usually is not.
A production manager needs to know which variables influence the result and to what extent, in order to decide what to change, compare it with their experience and explain it to their team. At Kensight we work with models that meet that condition: they show what has an influence and how much. They are not causal models, because they are built on operating data and not on controlled experiments, but they can be run in both directions: from the process to the result, to anticipate what is going to happen, and from the desired result to the operating conditions that make it more likely.
This second direction is what turns an analysis into a decision-making tool.
From the model to a decision in the plant
A model only creates value when it changes something in the way the plant operates. That is why, at the end of the analyse phase, the question is not which variables are significant?
but what are we going to do differently from now on?
.
- New operating windows: combinations of set points that the model associates with better results and that can be validated with trial batches.
- Raw material criteria: which properties, and in which combination, should be monitored when a supply is received.
- Anticipatory adjustments: when the input characteristics are known, adapted operating conditions can be proposed instead of reacting when the result is already out of specification.
Each of these actions must be validated in the plant, with the production team, before being incorporated into the standard. For example, in a chemical plant with batch production, this type of work improved product purity with estimated annual savings of €140,000.
Sustaining the improvement: the control phase
The control phase is the most neglected one and the one that determines whether the improvement lasts. With many variables, monitoring each one with its own control chart produces many false alarms and, at the same time, misses deviations that can only be seen in the combination of variables.
Multivariate control charts address that problem: they summarise the state of the process in a few indicators and, when something deviates, they make it possible to identify which variables are contributing. This is the logic we apply in ARGOS, our intelligent process monitoring software, so that the plant team detects in time when the process is moving away from the reference conditions.
What to do first
If you already work with Six Sigma and recognise yourself in this scenario, these are good first steps:
- Count your variables: check how many variables you record in the process you want to improve and how many are related to one another. If there are many, univariate analysis will probably fall short.
- Explore before modelling: a PCA on historical data will show you patterns, atypical batches and groupings that cannot be seen in individual trends.
- Define the decision you want to make: before building any model, specify what change you would be prepared to make in the plant if the data supports it.
- Think about control now: decide who will monitor the process once it has been improved and with which indicators, so that the improvement does not fade over time.